Click here for project specs and suppliers
Development type: End-of-terrace urban infill retrofit
Method: Mix of external and internal insulation, heat pump, demand-controlled ventilation and PV
Location: Fairview, Dublin 3
Standard: A1-rated deep retrofit
Total energy cost: €77/year – measured total for all energy use, including standing charges and VAT.
(see In Detail panel for full breakdown)
An electric car crash, a global pandemic and choosing tiles from the maternity ward of the Rotunda Hospital were not on Greg Sheaf and Rebecca O’Neill’s retrofit bingo card.
And yet, having endured life in an 1880s house described throughout survey reports as suffering from “delayed maintenance”, they were well-equipped for the challenges that came their way.
The couple moved into their G-rated, endof- terrace home in Fairview in July 2019 and soon adopted what they describe as a “slightly Victorian style of living”.
“When we moved in, the house didn’t have working central heating. We had a second- hand oil boiler put in, but the radiator in our room broke fairly instantly so we had no heating in our bedroom. I think it got down to thirteen degrees in our room at one point,” said Greg. “We had curtains up in the doorways to try and keep the heat in, we had the oil radiators going and we had lots of hot water bottles.”

“The bathroom was particularly grim because it was on an external corner, so it was incredibly cold,” said Rebecca. “And the bath itself never heated up. Even if you were having a shower and you had the trickle of hot water over you, your feet were always stone cold because it just never warmed up in any meaningful fashion.”
The kitchen presented a different set of problems. Situated within a poorly-constructed extension from the 1960s, it was “probably one of the worst rooms in the house”, according to Rebecca.
“It was entirely breeze block and had absolutely no insulation. It had a flat roof, which we had to get re-felted because it was just leaking continuously. If the rain hit the house in a particular way, we had rivulets of rain coming in along the external edges.”

A standalone electric cooker was quickly disposed of owing to concerns about wiring, leaving Greg and Rebecca reliant on an air fryer, a toaster oven and one ring for four years. “We were essentially camping,” said Rebecca.
Faulty wiring throughout the house meant the pair avoided regular use of electrical appliances as much as possible. They say they lived in constant fear of burning the house down. “It turned out the electrics were incredibly dodgy, and the house was not earthed,” said Rebecca. “But apart from that, it was fine!” said Greg.
Drawn to the property for its extensive garden, Greg and Rebecca were under no illusions that the house itself needed extensive work to make it comfortable. However, while they initially hoped to take a piecemeal approach, it quickly became clear that tackling the renovation all at once was the only way.
https://www.passivehouseplus.co.uk/magazine/upgrade/kill-bills-end-of-terrace-all-but-ends-energy-costs#sigProIdd4c40a9828
A question of fabric
It was 2019 when the couple first approached architect Brendan O’Connor of Abode Design, who had been recommended by another architect. “We wanted someone who was experienced in working with both the quirks of a period property and retrofitting with a low-energy mindset, said Greg. “After we had contracted Brendan I realised I had already heard of him ... I'd read about his work within Passive House Plus when I'd been researching retrofits and Enerphit principles.”
They were clear about what they wanted – an energy efficient, comfortable home with a fabric-first approach – and were willing to wait and save if that was what it took to do it right. After obtaining the initial estimate, which later increased when material costs escalated during the pandemic, it became clear that this is what they would have to do. They spent several more years saving before the construction finally kicked off in 2023. “We were very keen to do it properly,” said Greg.
With Brendan leading the project as architect, the team at family-run building contractor Glanmore Construction Ltd. came on board.

Before and after
As the house had been subjected to some questionable DIY throughout the decades, the team had to rectify previous alterations alongside the renovation work. The ground floor had been raised – it is suspected in response to historical flooding – leaving the door heads extremely low and compressing the first riser of the staircase to just one inch. As part of the project, the original floor level and the step were reinstated, with the team taking the opportunity to install insulation and a radon barrier during this mammoth task.
Replacing the aforementioned kitchen extension was another non-negotiable. A new, single-storey extension, which comprises an open-plan kitchen and dining area, is smaller than the original, reducing the overall footprint of the home. This suited Greg and Rebecca, who were keen to preserve as much of their garden as possible.
“It is very unusual to get a client saying, ‘I want a smaller house, please’. Usually, they want a bigger house with deep retrofit and for it to cost nothing, whereas Greg and Rebecca knew that the scope of work was what would generate the budget. They could have had a bigger amount of floor area but chances are the shell would have to suffer in terms of performance,” said Brendan. “They were very clued in to the impact of a brief on a project.”
The home was converted from a four-bedroom into a two-bedroom home. Upstairs, a dividing wall which contained asbestos was removed to transform two bedrooms into one large master bedroom, while another bedroom was converted into an upstairs bathroom.

As energy efficiency and comfort were priorities for Greg and Rebecca, much of the focus and budget was directed towards insulation and airtightness. Existing windows and doors were replaced with triple-glazed units, fireplaces were fully sealed and the roof, floor and walls were extensively insulated.
A mixed insulation strategy was adopted. The side and rear walls were wrapped in external insulation, while the front façade was internally insulated to preserve the brickwork of this period property.
For the internal insulation, Brendan opted for an IQ-Therm breathable insulation system. Additionally, a coating of Remmers Funcosil SNL was applied directly to the external brickwork. This clear, siloxane-based coating penetrates the brick, allowing it to repel liquid water while still permitting vapour diffusion. While internally insulating single-leaf walls increases the risk of interstitial condensation if not done carefully, Brendan was acutely aware of the potential pitfalls. As a former colleague of Joseph Little, one of Ireland’s leading authorities on this subject, and with years of experience working on period properties, he approached the project with particular care.
“Once I’m doing internal wall insulation, I get very worried about condensation, especially when you’re achieving good airtightness and you want to lose as little heat as possible,” he said. “I don’t go for the same U-values on internal wall insulation as external wall insulation because I want some of the heat to actually get to that wall to help it dry.”

(inset) Original kitchen
“Where you have joists going into the original brickwork, we sand-cemented the joints between them and taped around each one just to achieve the airtightness. But then you have these cut ends of timber in the masonry, and you want to avoid them getting too damp so that’s why you have to be very careful. I did the IQ-Therm internally there. You have to prepare it with a render product and then you apply the IQ-Therm to that and it has pores in it to help it breathe. If moisture needs to breathe into the house, it can, and then with the siloxane coating on the outside, it means it’s not blocked from breathing outwards as well. So, you shouldn’t get the cyclical build-up of moisture that you can get over a period.”
Flood defence was also a consideration for Brendan. Conscious of historical flooding in the area, he replaced the concrete pad around the house with pebbles and a perforated drain. This strategy proved effective. When a water main burst and flooded nearby parts of Fairview during heavy storms in January 2026, Greg and Rebecca’s house was unaffected.
The tightly-sealed, highly-insulated envelope is supported by a suite of new systems. The house was fitted with a 5kW Mitsubishi Electric Ecodan air source heat pump, an Aereco demand controlled mechanical extract ventilation system (DCMEV), and a solar PV array and battery.

In terms of design, Greg and Rebecca were keen to be as sympathetic as possible to the Victorian character of the house. While few notable original features remained, they preserved the architraves, some original doors and the wooden floors upstairs, which they sanded and stained.
Stepping into this house today feels entirely different to how it did in 2019. The deep retrofit has transformed the property from a cold, damp G-rated house into a fully electric A-rated home, achieving an airtightness of approximately 2 m³/hr/m² at 50 Pa.
The construction work took 14 months in total, with some unanticipated challenges extending the original timeline. Perhaps the most unusual event occurred when an electric car in an adjacent car park crashed into the gable wall of the house, narrowly missing one of the construction workers on site.
“Vlad had just gone past with rubble in a wheelbarrow. And then, in a few seconds, that wall he’d walked past wasn’t there anymore. He would have been killed, I think, if it had happened five seconds earlier. He was very lucky,” said Brendan. “It was a strange one. It wasn’t necessarily the kind of thing covered in my health and safety training.”

The incident delayed the project as Greg and Rebecca waited for the insurance payout, while the emergence of some new cracks in the building following the crash required intervention.
“We had to get the engineer involved in putting in conservation grout. There’s a bit of rebar that you embed in the grout lines and then a specialist mortar is used to bond the wall together and make sure it doesn’t move any further,” said Brendan.
Another hurdle was the discovery of rot in a dividing wall, which Greg described as being made from “chewing gum and willpower”. This rot issue was linked to the historic raising of the floor and required additional structural intervention.
Real living
Greg and Rebecca stayed in Rebecca’s family home in Carlow for much of the construction period, which helped to keep overall costs down. In the final few months, they welcomed their son, Xavier into the world, adding to both the busyness and excitement of an already eventful time.
“During the project, we did the typical Grand Designs thing. I got pregnant,” said Rebecca. “I remember Greg taking phone calls about the kitchen tiles while we were in the Rotunda.”
In June 2024, the family celebrated their long-awaited move-in day with their four cats in tow.
“It was kind of insane. We had a six-monthold so there was just a lot going on,” said Rebecca. “Neither of us had family around so every so often, we would call on a friend to literally hold the baby while we shunted furniture and stuff around.”
Busy family and work lives mean that adding finishing touches to the house has been slow, but on the upside, this has given them time to really get to know the space. Greg remarks that living in an A1 house has been a learning curve with plenty of experimentation, but one that he has enjoyed. Though noting that the technology is not very intuitive or user-friendly, he adds that he has found some helpful support on online forums and Facebook groups.

“The technology isn’t quite at the set-itand- forget-it stage. With the heat pump, there’s been quite a lot of trying to get the compensation curve right, but I’ve got that cracked now. With the solar panels, I had to do a lot of experimentation with charging them at night and selling it back to the grid, and that’s why it’s kind of cost-neutral because you buy cheap and you sell it back to them,” he said.
“The batteries are your gamechanger. The solar and the battery system is essentially paying for our energy.”
Living in an A1 home requires a “different type of maintenance”, as Rebecca said. “Whereas before we had to think about getting the oil topped up or bleeding radiators, now it’s making sure that, say, if a firmware update comes through and badly affects your batteries, you’re on to the company to revert the firmware upgrade,” she said.
“You’re never worry-free, it is just different. But the comfort is just out of this world compared to what it was like before,” said Greg.
Indoor temperatures remain between 21 and 23 degrees year-round, even during heatwaves and cold snaps. Being fully electric, and therefore free from combustion appliances, has also had a positive impact on the air quality in the home. All of this has made a huge difference to Greg and Rebecca’s dayto- day lives.
“You kind of forget how much mental space is kind of taken up by being uncomfortable. It is a drag, you know? And we just don’t have that anymore,” said Rebecca. Worries about bills or the fluctuating price of oil are also a thing of the past. Owing to the PV array and battery, the couple have been able to maintain a very comfortable home at a very low cost. Once income from the PV array is included, their total household energy bill for 2025 amounted to just under €77, including standing charges and taxes. As they do not own a car, they don’t have to factor motor fuel or EV charging into their budget.
While bringing the renovation to fruition took time and brought some unique challenges, the outcome has been worth every step.
“What we decided was our thing of, you know, keeping up with the Joneses, was to be the most efficient house on the street. That’s what we wanted it to be. We wanted it to be the cheapest to run, the most efficient and the most comfortable house on the street. And I think that’s been nailed,” said Greg.

Selected project team members
Clients / homeowners: Rebecca O'Neill & Greg Sheaf
Building design & specifications: Abode Design
Main contractor / builder: Glanmore Construction
Plumbing & heating installer: Blackrock Heating and Plumbing
Technical advisor, BER, ventilation validation: Donovan Low Energy
Airtightness tester: GreenBuild
Electrician: Marino Maintenance Services Limited
Solar PV installer: Solar PV Panels Ireland
Internal insulation & facade treatment: Conservation Technology
EWI manufacturer: EWI Pro Insulation Systems
EWI installer: JJR Insulation
Windows & doors supplier: Exclusive Wood Company / Viking Window AS
Airtightness membrane & tapes: Pro Clima, via Wurth
Heat pump manufacturer: Mitsubishi Electric Roofing system: Dryseal, via Hambleside Danelaw
Mineral wool insulation: Knauf
PIR insulation: Mannok / Unilin
Flat roof window: Velux
Kitchen: Fitzgerald Kitchens
Kitchen countertop: Granite & Marble Crafts
Sanitaryware: Bathshack
Custom joinery: Clooney Woodcraft
In detail
Project overview: Deep retrofit of Victorian end-of-terrace
Development type: Deep retrofit and replacement extension of an end-of-terrace solid brick dwelling originally constructed c.1880. Total floor area 107.85 m²
Site type & location: Urban site, Fairview, Dublin 3
Budget: N/A
Completion date: August 2024
Passive house certification: N/A
Number of occupants: 2 adults & 1 child
BER
Before: F BER (419.51 kwh/m2/yr) kWh/m2/yr
After:A1 BER (3.43 kwh/m2/yr) – (A0 on new scale) kWh/m2/yr
Energy performance coefficient (EPC): 0.01
Carbon performance coefficient (CPC): 0.007
Environmental assessment method: N/A
Air quality context: Urban site on a busy road. Mechanical ventilation strategy adopted to provide continuous fresh air while minimising heat loss and uncontrolled infiltration
Airtightness
Before: N/A
After: Preliminary test after windows installed: 2.952 m³/hr/ m² at 50 Pa. Retest after first fix: 2.343 m³/hr/m². Final test: 2.11 m³/hr/m²
Thermal bridging: Careful detailing was undertaken throughout to reduce thermal bridging. Measures included use of external wall insulation to side and rear elevations, insulated plaster system to retained front elevation, thermally broken window fixings, insulated window reveals, dedicated service cavity to reduce penetrations through the airtight layer, and continuity of insulation at roof junctions. Windows were installed using Fischer Thermax thermally broken fixings. Y-value: not calculated
Ground floor
Before: Existing uninsulated solid floor
After: Floor level lowered to reinstate original proportions and levels. Ground floor build-up consists of 150 mm PIR insulation beneath 50 mm hemihydrate screed with integrated certified radon barrier and sealed penetrations. U-value: 0.12 W/m²K
Extension floor: Ground-bearing insulated slab with 150 mm PIR insulation beneath screed and integrated radon barrier. U-value: 0.12 W/m²K.
Walls
Before: Existing solid brick external walls with no insulation
After: Front elevation upgraded internally using 80 mm Remmers IQ-Therm breathable insulation system with 30 mm IQ-Therm to reveals. Existing brick facade repaired and treated externally with Remmers Funcosil SNL siloxane impregnation. U-value: ~ 0.26 W/m²K. Side and rear elevations (including replacement extension) upgraded with 150 mm graphite EPS external wall insulation system finished with Baumit mineral render. U-values: ~ 0.19 W/m²K
Existing roof
After: Minimum 350 mm Earthwool insulation installed within roof structure together with Intello airtightness membrane and plaster skim finish. U-values: ~ 0.10 W/m²K
Bathroom coombed ceiling insulated with Knauf Omnifit mineral wool between rafters and 75 mm foil-faced PIR insulation beneath rafters, sealed with proprietary airtightness tapes. U-values: 0.14 W/m2K
Extension roof: Warm roof build-up consisting of 125 mm PIR insulation over deck with additional 125 mm Knauf Metstud insulation between joists. Taped Intello membrane used as airtight layer beneath. Finished externally with Agrément-certified Dryseal roof system and washed pebble ballast
Windows & doors
Before: Existing older single/double-glazed units
After: Viking Window AS aluclad triple-glazed windows and doors with thermally broken installation fixings. Approximate overall installed U-value: 0.72 W/m²K. Window restrictors installed for child safety and guarding added where required to comply with Part K
Roof windows
Before: N/A
After: Velux triple-glazed fixed skylight CFU 25Q + ISU 209 - U-values: ~ 0.60 W/m²K
Heating system
Before: >20-year-old oil boiler & radiators throughout entire building
After: 5kW Mitsubishi Electric Ecodan air source heat pump. Heat distributed via underfloor heating at ground floor level and low-temperature aluminium radiators at first floor level
Ventilation
Before: Natural ventilation through infiltration and window opening
After: Aereco demand-controlled mechanical extract ventilation (DCMEV) system providing continuous extract from wet rooms with demand-controlled fresh air inlets to habitable rooms
Water efficiency: N/A
Renewable electricity: 10-panel Jinki solar photovoltaic array with Solis inverters and 10.6 kWh Weco battery storage system. Electricity is used to support household demand including operation of the air source heat pump, with surplus generation stored within the battery before export Sustainable materials: Retrofit-first approach retaining the existing structure. Remmers IQ-Therm breathable internal insulation, graphite EPS external wall insulation, mineral wool insulation and triple-glazed aluclad timber windows
Embodied carbon: Not calculated
Material impact: The primary embodied carbon strategy was retention and upgrade of the existing dwelling rather than demolition and rebuild. Existing walls, roof structure and foundations were retained where possible, reducing material consumption and constructi
on waste while improving operational performance Energy bills: Total energy bills for calendar year of 2025 of €77, including standing charges and VAT, based on Pinergy tariff, including €920 of imports and standing charges, and €843 of payments for exports
Heating use: Data from the Mitsubishi Ecodan Melcloud system shows 1,783 kWh of electricity use in 2025 to deliver 8,064 kWh of delivered energy (heating and hot water) – meaning a seasonal COP of 4.52
Monitored temperature: Lounge temperatures hovering between 20-21C (Jan-June 2026), with one measurement of below 19C and roughly 25 peaks of over 22C